Patna Metro: Route Map, Stations and Latest Status

Short answer

Patna Metro is partly open. About 6.2 km of the elevated Blue Line carries passengers between Patliputra Bus Terminal and Malahi Pakri. The first stretch opened in October 2025, and the extension followed on 2 July 2026. The underground section and the Red Line are still being built.

By 7 min read

Patna Metro train standing at an elevated station platform
On this page
  1. Key takeaways
  2. Patna Metro status at a glance
  3. Patna Metro route map
  4. Patna Metro stations on the Blue Line
  5. Fare, travel time and timings
  6. What is still being built
  7. Cost and funding
  8. How to use the open section today
  9. How Patna compares
  10. Patna Metro safety and ticket habits
  11. Where to confirm future changes
  12. Frequently asked questions about Patna Metro
  13. What riders should watch next
  14. Sources

Key takeaways

  • Open now: about 6.2 km of the Blue Line, from Patliputra Bus Terminal to Malahi Pakri.
  • The 2 July 2026 extension was reported to take about 15 minutes, with a ₹30 fare.
  • Khemnichak had no train stop at the extension because work there was incomplete.
  • The Blue Line's underground section and the Red Line are not open.

Patna Metro has moved from drawings to daily service, but only on a short elevated stretch. Many maps show the whole planned network, which can mislead a first-time rider. This guide separates what you can board today from what is still under construction.

Below, you will find the route map in table form, the station list, fare notes, the project’s cost and the main items to watch. More city networks appear in our metro section and the India infrastructure tracker.

Patna Metro status at a glance

Item Position
Open line Part of the Blue Line (Corridor 2)
Open length About 6.2 km
Open end points Patliputra Bus Terminal (New ISBT) and Malahi Pakri
First opening October 2025
Extension to Malahi Pakri 2 July 2026
Blue Line underground section Under construction
Red Line (Corridor 1) Under construction

Sources give 6 or 7 October 2025 for the first day of service, so we state the month. The dated record sits on our Patna Metro status page.

Patna Metro route map

The city plan has two main corridors. They then cross at two interchange points, Patna Junction and Khemnichak.

Corridor Colour Route Planned length Status
Corridor 1 Red Line Danapur – Khemnichak via Mithapur About 17.9 km Under construction
Corridor 2 Blue Line Patna Junction – Patliputra Bus Terminal via Gandhi Maidan About 14.5 km Partly open

The north–south Blue Line starts under the city centre. It then rises onto a viaduct towards the bus terminal in the south-east. The Red Line, meanwhile, runs broadly east to west and ties Danapur to the centre.

Patna Metro stations on the Blue Line

The Blue Line has 12 planned stations. Seven are underground, and five are elevated.

No. Station Type Passenger status
1 Patna Junction Underground Under construction
2 Akashvani Underground Under construction
3 Gandhi Maidan Underground Under construction
4 Patna Medical College and Hospital Underground Under construction
5 Patna Science College Underground Under construction
6 Moin-ul-Haq Stadium Underground Under construction
7 Rajendra Nagar Underground Under construction
8 Malahi Pakri Elevated Open
9 Khemnichak Elevated No stop reported at the July 2026 extension
10 Bhootnath Elevated Open
11 Zero Mile Elevated Open
12 Patliputra Bus Terminal Elevated Open

Station counts differ between reports because Khemnichak is physically on the open stretch but unfinished. The July 2026 report described four halts, which matches the four open stations above. Check the platform board for any later change.

Where each open station helps

  • Patliputra Bus Terminal: useful for intercity bus passengers.
  • Zero Mile: a handy point for the highway junction area.
  • Bhootnath: serves neighbourhoods along the New Bypass Road.
  • Malahi Pakri: brings the line to the Kankarbagh side.

Fare, travel time and timings

At the extension, officials’ announcement was reported as a journey of about 15 minutes from the bus terminal to Malahi Pakri, with a fare of ₹30. Fares can differ for shorter trips and may be revised, so check the ticket counter.

Detail Reported figure
Open distance 6.2 km
Time, end to end About 15 minutes
End-to-end fare (July 2026) ₹30
Train frequency About every 20 minutes
Design top speed 80 km/h

Meanwhile, third-party pages list daytime service of roughly 8 am to 10 pm. However, we have not verified those hours with an official timetable. Therefore, confirm the first and last train before relying on the metro for an early bus or late arrival.

Is Patna Metro useful for your trip today?

The answer depends on where you start and finish. If both points sit close to the open stations, the train can save time on a busy road. If your destination is Gandhi Maidan or Patna Junction, however, you still need a road ride.

For example, someone living near Bhootnath may reach the bus terminal without joining highway traffic. By contrast, a rail passenger from the city centre gains little today.

Compare three things before choosing: the walk to the station, the wait for a train and the final connection. Since trains were reported about every 20 minutes, a missed service matters. So check the board first, then decide whether an auto would be quicker.

What is still being built

The underground stretch

The remaining part of the Blue Line includes the busiest central stops. Tunnelling and station boxes in a dense city take longer than a viaduct. Larsen & Toubro holds the underground work contract, with a reported value close to ₹1,960 to ₹1,990 crore depending on the source.

The Red Line

The east–west corridor will matter most for daily commuters from Danapur. Meanwhile, elevated work and underground stations progress separately. We have not seen a firm, official opening date for the full line.

Interchanges

  1. Patna Junction will link both lines beside the main railway station.
  2. Khemnichak will provide the second interchange in the south-east.

Until these work, the network cannot offer line-to-line transfers.

Cost and funding

The estimated project cost is ₹13,365.77 crore, excluding land that the Bihar government pays for. The Japan International Cooperation Agency has a loan of ₹5,520.93 crore for the project, described as about 60 per cent of project cost. Delhi Metro Rail Corporation has been involved in delivery.

Longer-term phases have also been discussed, including an extension from Didarganj towards Fatuha. Still, these are plans, not construction commitments with confirmed dates.

How to use the open section today

  1. Check the latest timetable at the station or from the operator.
  2. Reach one of the four open stations.
  3. Buy a ticket and pass security screening.
  4. Board the train and note the final stop shown.
  5. Plan an auto or bus link for central Patna, which the metro does not yet reach.

For example, a passenger arriving at the bus terminal can ride to Malahi Pakri and continue by road. The metro alone will not yet take that person to Patna Junction.

How Patna compares

Early metro openings often start with one short elevated section. Delhi shows what a mature interchange looks like, as our Mayur Vihar Phase 1 metro station guide explains. Lucknow links its metro with a major rail hub at Charbagh railway station, a connection Patna Junction aims to offer later.

Fare rules also vary by city. Try our metro fare calculator for networks with published slabs.

Patna Metro safety and ticket habits

A new system brings new routines for many riders. A few simple habits help everyone.

Habit Reason
Allow time for security screening Bags are checked before the platform
Stand behind the yellow line Keeps you clear of the moving train
Let passengers exit first Speeds up boarding at busy halts
Keep your ticket until exit It may be needed at the gate
Report unattended bags Staff can check them safely

Families should hold young children’s hands on stairs and escalators. Similarly, senior citizens can ask staff where the lift is. If a service is delayed, listen to station announcements before leaving, because a replacement train may be close. Before your first trip, check the operator’s latest notice on permitted items and photography rules.

Where to confirm future changes

New openings usually follow safety checks, so a finished-looking station may still be closed. Watch for notices from the Patna Metro Rail Corporation and station announcements. Then compare the opening date, the exact stations covered and the service hours. If a social media post gives no source, however, wait for confirmation before changing your travel plan. We follow the same rule when updating our status page, which helps keep the record dependable.

Frequently asked questions about Patna Metro

Is Patna Metro open now?

Yes, partly. About 6.2 km of the elevated Blue Line carries passengers. The rest of the network is under construction.

Which stations are open in Patna Metro?

Patliputra Bus Terminal, Zero Mile, Bhootnath and Malahi Pakri form the open halts reported after July 2026.

What is the Patna Metro fare?

The end-to-end fare reported at the July 2026 extension was ₹30. Confirm current fares at the counter.

Does Patna Metro reach Patna Junction?

No. The underground Patna Junction station is still under construction.

How many lines does Patna Metro have?

The current project has two corridors, the Red Line and the Blue Line, with interchanges at Patna Junction and Khemnichak.

How much does the project cost?

The estimate is ₹13,365.77 crore, excluding land.

When will the Red Line open?

We have not found a firm official date for the full Red Line. We will update the status when one is confirmed.

What riders should watch next

Patna Metro already helps trips on the south-eastern stretch, yet its biggest benefit depends on the central tunnel. Watch for a Khemnichak opening, safety clearance for underground stations and an official Red Line schedule. Until then, plan a road link for the city centre and verify timings before you go.

Sources

  1. Patna Metro Rail Corporation, project agency
  2. Wikipedia: Patna Metro, Blue Line and station pages
  3. NewKerala (agency report): Malahi Pakri extension, July 2026

Information only. The Hind Times is not affiliated with any government or organisation. See our disclaimer.

A publication byline for our independent infrastructure desk. We name sources, date each status check and correct confirmed errors. We are not affiliated with any government or organisation. Read the methodology.

Related guides

Project status

  • Patna Metro
    Metro · Patna
    Partly open
    About 6.2 km of the elevated Blue Line is open. The Red Line is under construction.
    Checked
  • Pune Metro Line 3
    Metro · Pune
    Partly open
    19 of 23 stations open
    Checked
  • Bengaluru Metro Pink Line
    Metro · Bengaluru
    Partly open
    6 of 18 stations open
    Checked
  • Partly open
    Kavi Subhash to Beleghata is running. Beleghata to IT Centre was in trials and not yet open.
    Checked