Atal Setu status: where it stands
By The Hind Times EditorialPublished Last checked
At a glance
Atal Setu is open. The six-lane bridge in the Mumbai region is 21.8 km long, of which 16.5 km is over the sea. It opened on 12 January 2024.
Key facts
| Length | 21.8 km |
|---|---|
| Over the sea | 16.5 km |
| Lanes | 6 |
| Opened | 12 January 2024 |
Timeline
- 12 Jan 2024
Bridge opens
Before you cross
Vehicle restrictions, speed limits and toll apply on the bridge. Check the current rules and charges from the operating authority.
Sources
Change log
- 26 Nov 2026 Page published after checking the listed sources.
Spotted an error? Email a correction with a source.