Atal Setu status: where it stands

By The Hind Times EditorialPublished Last checked

At a glance

Atal Setu is open. The six-lane bridge in the Mumbai region is 21.8 km long, of which 16.5 km is over the sea. It opened on 12 January 2024.

Status
Open
Progress
21.8 / 21.8 km open
Opened on 12 January 2024.

Key facts

Length21.8 km
Over the sea16.5 km
Lanes6
Opened12 January 2024

Timeline

  1. 12 Jan 2024
    Bridge opens

Before you cross

Vehicle restrictions, speed limits and toll apply on the bridge. Check the current rules and charges from the operating authority.

Sources

  1. Press Information Bureau release

Change log

  • 26 Nov 2026 Page published after checking the listed sources.

Spotted an error? Email a correction with a source.