Western Peripheral (KMP) Expressway status: where it stands
By The Hind Times EditorialPublished Last checked
At a glance
The Western Peripheral Expressway, also called the KMP Expressway, is fully open. It runs 135.6 km from Kundli to Palwal around the western side of Delhi. The Manesar–Palwal section opened in April 2016 and Kundli–Manesar on 19 November 2018.
Key facts
| Length | 135.6 km |
|---|---|
| Lanes | 6 |
| Runs between | Kundli and Palwal |
| Manesar–Palwal (53 km) | Opened April 2016 |
| Kundli–Manesar (83 km) | Opened 19 November 2018 |
Toll points, north to south
- KundliToll point 1Open
- KharkhodaToll point 2Open
- BahadurgarhToll point 3Open
- BadliToll point 4Open
- FarrukhnagarToll point 5Open
- PanchgaonToll point 6Open
- ManesarToll point 7Open
- TaoruToll point 8Open
- SohnaToll point 9Open
- PalwalToll point 10Open
Schematic order only. Spacing does not show distance.
Timeline
- Apr 2016
Manesar–Palwal section (53 km) opens - 19 Nov 2018
Kundli–Manesar section (83 km) opens
What the corridor does
The expressway lets traffic move between the northern and southern approaches to Delhi without entering the city. The toll points above are listed in order from Kundli to Palwal.
Toll
Charges depend on the vehicle class and the points where you enter and leave. We do not publish a rate table here until we can cite a current official one.
Sources
Change log
- 26 Nov 2026 Page published after checking the listed sources.
Spotted an error? Email a correction with a source.