Airports

Pune Airport New Terminal Building: Facilities, Capacity and Access Guide

Short answer

The Pune airport new terminal building covers about 52,000 square metres at Lohegaon and is designed for more than 9 million passengers a year. Prime Minister Narendra Modi inaugurated it on 10 March 2024, and flights began using it on 14 July 2024. It has five aerobridges.

By 7 min read

Aircraft at an airport aerobridge, illustrative photo for the Pune airport new terminal building guide
On this page
  1. Key takeaways
  2. Pune airport new terminal building: quick facts
  3. Timeline from construction to first flights
  4. Facilities inside the terminal
  5. Capacity: why the airport still feels full
  6. Old terminal: current position
  7. How to reach the airport
  8. Travel tips for a smoother visit
  9. What comes next for Pune aviation
  10. Documents and baggage checklist
  11. If your flight is delayed
  12. Frequently asked questions about the Pune airport new terminal building
  13. Make your airport run easier
  14. Sources

Key takeaways

  • Opened to passengers on 14 July 2024, four months after inauguration.
  • About 52,000 sq m, five aerobridges, 34 check-in counters and 25 self check-in counters.
  • The airport handled about 11 million passengers in 2025–26, above the new building's design figure.
  • The metro does not reach the terminal; Ramwadi station is the closest.

The Pune airport new terminal building changed the daily experience at one of India’s busiest city airports. That is because it added far more space for check-in, security and boarding at the Lohegaon site. Even so, passenger numbers have grown quickly, so smart planning still matters.

Below, you will also find the building’s size and facilities, the key dates, the old terminal’s status and your options for reaching the airport. For more aviation updates, see our airport project pages and the India infrastructure tracker.

Pune airport new terminal building: quick facts

Feature Detail
Location Lohegaon, Pune
Floor area About 52,000 sq m
Design capacity More than 9 million passengers a year
Aerobridges Five
Check-in counters 34 staffed, 25 self-service
Baggage carousels Five
Inaugurated 10 March 2024
Operations began 14 July 2024

We keep a dated record on the Pune airport new terminal status page.

Timeline from construction to first flights

Work started in late 2018, with an original target of the end of 2020. However, the pandemic and labour shortages pushed the schedule back. Construction finished in March 2024, and the Prime Minister inaugurated the terminal by video link on 10 March.

Still, passengers did not move in that day. Reports linked the gap to pending permissions and a shortage of security personnel. Regular operations began on 14 July 2024, when Air India and Air India Express flights left for Delhi and Bhubaneswar.

Date Event
Late 2018 Construction starts
End 2020 Original completion target, later missed
10 March 2024 Inauguration
14 July 2024 First scheduled flights from the new building
September 2026 Renovated old terminal awaits security clearance

Facilities inside the terminal

The new building is about twice the size of the earlier terminal. Its design also draws on Maharashtra’s culture, including Warli-style art. A bronze statue of Chhatrapati Shivaji Maharaj stands in front.

Departures

  1. Check your flight details and reporting time before leaving home.
  2. Use a self check-in counter if you travel with cabin bags only.
  3. Drop checked baggage at your airline’s counter.
  4. Clear security screening.
  5. Watch the boards for your boarding gate and aerobridge or bus gate.

Arrivals

After landing, follow signs to the baggage hall. From there, five carousels serve arriving flights. Keep your boarding pass or tag stub until you leave the hall, because staff may check it.

Capacity: why the airport still feels full

Capacity figures help explain crowding. The Airports Authority of India recorded 11,005,988 passengers at Pune in 2025–26, up 5.2 per cent. Aircraft movements reached 71,523, and cargo rose 29.4 per cent to about 54,712 tonnes.

Measure (2025–26) Figure Change on previous year
Passengers 11,005,988 Up 5.2%
Aircraft movements 71,523 Up 3.9%
Cargo 54,711.9 tonnes Up 29.4%

Yet the new terminal’s design figure is a little above 9 million. The total airport traffic therefore exceeds what this one building was designed to handle. However, that comparison is our own reading of the two published numbers, not an official statement about overcrowding. Still, it shows why the renovated older block matters.

Old terminal: current position

After the new building opened, the old terminal closed for renovation. In September 2026, local reports said the upgraded block of about 4,075 sq m was ready. It adds 14 check-in counters and two boarding gates, along with improved security areas and Digi Yatra facilities.

At that time, however, the block was waiting for final clearance from the Bureau of Civil Aviation Security. We have not confirmed that it has opened to passengers since. So check your airline’s message for the correct entry point before you fly.

Using the Pune airport new terminal building at busy hours

Because traffic exceeds the design figure of the new block, queues can build quickly. Early morning and evening departures often feel the most crowded, although this varies by day.

First, finish web check-in at home. Then pack liquids and electronics so that you can remove them fast at security. After screening, walk to your gate area before you shop or eat.

If you travel with a child, a senior citizen or someone who needs a wheelchair, tell the airline in advance. That way, staff can arrange help at the entrance. Finally, keep your phone charged, since gate changes often arrive by message.

How to reach the airport

The Pune Metro does not run to the terminal. Ramwadi, the eastern end of the Aqua Line, is the nearest metro station, about 3.6 km away by road according to a recent travel guide. From there, feeder buses connect the area with the airport.

Starting point Approximate road distance
Ramwadi metro station 3.6 km
Koregaon Park 6.2 km
Kharadi 8.1 km
Pune Junction railway station 8.5 km
Shaniwar Wada 10.7 km
Pimpri 21.8 km
Hinjawadi 24.4 km

Prepaid taxis, app cabs, auto-rickshaws and PMPML city buses are the usual choices. Traffic on the approach roads can be slow, so allow a generous margin at peak hours.

Coming from Hinjawadi

Hinjawadi trips cross much of the city. Today, part of the new Metro Line 3 is now open between Hinjawadi and Shivajinagar. Our Pune Metro Line 3 status page lists the open stations. You would still need an onward road or Aqua Line leg to get near the airport. If you drive, our fuel cost calculator helps estimate the run.

Travel tips for a smoother visit

  • Reach the airport about two hours before a domestic flight and three before an international one.
  • Complete web check-in to reduce time at counters.
  • Keep identity documents and your ticket ready at the gate.
  • Pack power banks in cabin baggage, not checked bags.
  • Confirm pickup points with your driver before landing.

What comes next for Pune aviation

Two longer-term items are worth watching. First, the state government approved renaming the airport after Sant Tukaram Maharaj; approval at state level is not the same as a completed official change. Second, a separate greenfield airport is proposed for the Pune region. As of October 2026, land acquisition for it was reported at 76 per cent.

Still, neither item changes how you travel today. Your flight still uses the Lohegaon airport unless your airline says otherwise. Planning a rail connection elsewhere? Read about Charbagh railway station in Lucknow.

Documents and baggage checklist

A short check at home saves stress at the entrance. Airlines set their own baggage limits, so read your ticket before packing.

Item Why it matters
Original photo identity document Needed at the entry gate
Ticket or boarding pass Shows your flight and passenger name
Cabin bag within airline limits Avoids repacking at the counter
Power bank in cabin baggage Not allowed in checked bags
Medicines and prescriptions Useful if your flight is delayed

If you use Digi Yatra, set up the app before travelling and keep your regular identity document as a backup. Likewise, label checked bags clearly and remove old tags. When a flight is delayed, stay near the boards and watch for airline messages, because gate details can change. Families should also agree on a meeting point inside the terminal in case someone gets separated.

If your flight is delayed

First, confirm the new time with your airline app or counter. Then stay inside the correct terminal area and watch the boards for gate changes. Ask the airline about meals or rebooking if the wait grows long. Meanwhile, tell anyone picking you up, so they do not circle the approach road. Keep receipts for extra expenses, because you may need them for a later claim.

Frequently asked questions about the Pune airport new terminal building

When did the Pune airport new terminal building open?

It was inaugurated on 10 March 2024. Scheduled flights began using it on 14 July 2024.

How big is the new terminal at Pune airport?

It covers about 52,000 square metres.

What is its passenger capacity?

It is designed to handle more than 9 million passengers a year.

How many aerobridges does it have?

It has five aerobridges.

Does the Pune Metro go to the airport?

No. Ramwadi on the Aqua Line is the closest metro station, a short road ride from the terminal.

Is the old terminal open again?

Reports in September 2026 said renovation was complete and final security clearance was pending. Check your airline’s latest message.

How far is Pune airport from Pune Junction?

It is about 8.5 km by road. Allow extra time for traffic.

Make your airport run easier

The Pune airport new terminal building offers more counters, more space and direct boarding bridges. So, to use it well, check in online, confirm your terminal entry and plan the road leg with a buffer. Recheck the old block’s status if your airline mentions a different entrance.

Sources

  1. Airports Authority of India, airport operator and traffic figures
  2. Wikipedia: Pune Airport (terminal specifications and 2025–26 traffic)
  3. Pune Pulse and PuneNow: old terminal renovation, September 2026
  4. Wego travel guide: road distances and Aqua Line access

Information only. The Hind Times is not affiliated with any government or organisation. See our disclaimer.

A publication byline for our independent infrastructure desk. We name sources, date each status check and correct confirmed errors. We are not affiliated with any government or organisation. Read the methodology.

Project status