Ahmedabad Vadodara Expressway (NE1): Route Map, Exits, Toll and Status
Short answer
The Ahmedabad Vadodara Expressway, officially National Expressway 1, is an open 93.1 km access-controlled toll road in Gujarat. It opened in August 2004 and has exit loops at Nadiad and Anand. Two-wheelers are not allowed, and car toll depends on your entry and exit.
By The Hind Times Editorial7 min read
On this page
- Key takeaways
- Ahmedabad Vadodara Expressway: key facts
- NE1 route map and exits
- Ahmedabad Vadodara toll
- Speed limit and driving rules
- Travel time and when to use it
- Upgrade history and current status
- Tips before you drive
- NE1 or the older highway?
- After you reach Vadodara or Ahmedabad
- Frequently asked questions about the Ahmedabad Vadodara Expressway
- Make the most of NE1
- Sources
Key takeaways
- India's National Expressway 1, open since 16 August 2004.
- 93.1 km between Ahmedabad and Vadodara, with exits for Nadiad and Anand.
- A published car toll table shows ₹135 end to end, while other guides quote ₹125 to ₹140.
- Two-wheelers are banned and the road is fenced.
The Ahmedabad Vadodara Expressway was India’s first road to carry the National Expressway number. Two decades on, it remains the quickest everyday link between Gujarat’s largest city and Vadodara. So knowing its exits, toll points and rules makes the short drive smoother.
Therefore, this guide covers the route, interchanges, toll figures, speed advice and upgrade history. For other corridors, visit our expressway section or the India infrastructure tracker.
Ahmedabad Vadodara Expressway: key facts
| Detail | Information |
|---|---|
| Number | National Expressway 1 (NE1) |
| Other name | Mahatma Gandhi Expressway |
| Length | 93.1 km |
| State | Gujarat |
| Opened | 16 August 2004 |
| Maintaining agency | National Highways Authority of India |
| Exit loops | Nadiad/Kheda and Anand |
| Two-wheelers | Not permitted |
The road was declared National Expressway 1 in 1986, long before construction finished. Prime Minister Atal Bihari Vajpayee inaugurated it. The original construction cost was about ₹475 crore.
NE1 route map and exits
The route runs south-east from Ahmedabad, passes the Nadiad and Anand areas and ends at Vadodara. Because access is controlled, you can enter or leave only at set points.
| Point | Connecting road | What it serves |
|---|---|---|
| Ahmedabad end | NH 47 and NH 48 | City entry and onward highways |
| Nadiad / Kheda exit | State Highway 12 | Nadiad and Kheda district towns |
| Anand exit | State Highway 60 | Anand, the dairy cooperative town |
| Vadodara end | NE 4 and NH 48 | Delhi–Mumbai corridor, Vadodara and routes south |
So plan your exit early. If you miss Nadiad or Anand, the next chance to leave may be far ahead.
Link with the Delhi–Mumbai corridor
At the Vadodara end, NE1 meets the NE 4 system, which is the Delhi–Mumbai Expressway. That corridor is opening in sections; a Vadodara–Godhra stretch was added in April 2026. Follow our Delhi–Mumbai Expressway status page before assuming a through route.
Ahmedabad Vadodara toll
Toll is collected according to the journey, with plazas serving Ahmedabad, the SP Ring Road side, Nadiad, Anand and Vadodara. A widely cited table for cars, jeeps and vans is below. However, it carries no revision date.
| Journey (car, jeep or van) | Published toll |
|---|---|
| Ahmedabad to Vadodara | ₹135 |
| Nadiad to Vadodara | ₹75 |
| Nadiad to Ahmedabad | ₹55 |
| Ahmedabad to Anand | ₹75 |
| Anand to Vadodara | ₹55 |
Other recent guides quote ₹125 or about ₹140 for the full trip. These differences usually reflect different revision years. So treat ₹125 to ₹140 as a planning range, and trust the plaza board or your FASTag statement.
Cost per kilometre
At ₹135 for 93.1 km, the full car trip works out to about ₹1.45 per km. By contrast, shorter hops can cost more per kilometre. This simple check is useful when you compare the expressway with the older highway.
| Journey | Planning toll | Comparison point |
|---|---|---|
| One way, full length | About ₹135 | Lower stress and fewer crossings |
| Round trip, two single tickets | About ₹270 | Ask about any return concession |
| Five working-day round trips | About ₹1,350 | Check monthly pass options |
You can test your own fuel and toll total with our fuel cost calculator and toll calculator.
Planning an Ahmedabad Vadodara Expressway day trip
A return visit is easy to plan if you count the whole journey. First, add the city drive to the Ahmedabad entry point. Next, add about an hour on the expressway in normal conditions. Finally, allow time to reach your address in Vadodara.
Leave a buffer for office-hour traffic at both ends, because the plazas and entry roads can slow down. If you plan a stop in Anand or Nadiad, however, check the exit rules first. That is because leaving and rejoining may mean separate toll charges.
Also keep some cash or a backup payment method, although FASTag is the usual option. Before the return leg, check fog advisories and fuel, since a late-evening drive offers less margin.
Speed limit and driving rules
Published speed figures vary widely, from 80 km/h to 120 km/h for cars. However, we have not confirmed a single current official figure. Obey the posted signs, which may differ by lane, vehicle class and section.
- Two-wheelers of all kinds are banned.
- Fencing keeps out stray cattle and local two-wheeler traffic.
- Underpasses and overbridges let local movement cross safely.
- Stopping is only for real emergencies.
Drivers should take extra care on the Ahmedabad–Nadiad stretch, which has a record of serious crashes. Fog also matters: a multi-vehicle pile-up was reported in 2005. So in low visibility, reduce speed and increase your following gap.
Travel time and when to use it
The expressway cut the typical journey from about two and a half hours to around one hour. However, city traffic at either end can add much more than the road itself. For that reason, plan the whole door-to-door trip rather than the expressway leg alone.
| Choose NE1 when | Consider another road when |
|---|---|
| You travel city to city | Your stop lies between the exits |
| You drive a car or heavier vehicle | You ride a two-wheeler |
| You value steady speed | You need frequent roadside stops |
Checklist by driver type
Different travellers need different preparation. A daily commuter should compare single tickets with any pass offered at the plaza. A family on a weekend visit, however, benefits more from an early start and one planned break.
Truck and bus drivers should check lane rules and rest hours before they enter. First-time users, meanwhile, should note the exit name and avoid last-second lane changes. In every case, keep your vehicle documents and FASTag ready, and report a hazard through the 1033 helpline once you are safely stopped.
Upgrade history and current status
The expressway is open and in daily use. It first began with two lanes in each direction. In 2009, the highways authority announced plans for six lanes. Later, IRB Infrastructure won the upgrade bid in 2011, with a reported project value of ₹3,300 crore.
The company agreed in 2013 not to collect toll until the construction under that contract was complete. Still, public summaries do not set out a clear final completion date for every part of the upgrade. We therefore record the road as open, without claiming a finished widening on every stretch.
Tips before you drive
- Check your FASTag balance.
- Inspect tyres and coolant, especially in summer.
- Note whether you exit at Nadiad, Anand or Vadodara.
- Take breaks before entering if you feel tired.
- Save the 1033 highway helpline.
Interested in other loops and bypasses? See Delhi’s Western Peripheral Expressway and Hyderabad’s Nehru Outer Ring Road. For the rail alternative taking shape in the same belt, check the Mumbai–Ahmedabad bullet train status.
NE1 or the older highway?
The choice depends on where you start, where you stop and what you drive. The expressway suits direct city-to-city travel, while the older route serves towns and roadside businesses along the way.
| Factor | Expressway (NE1) | Older highway route |
|---|---|---|
| Access | Only at set interchanges | Many local entry points |
| Two-wheelers | Not allowed | Generally allowed unless signs say otherwise |
| Toll | Charged by journey | Check the route for plazas |
| Stops | Limited | Frequent |
Compare live travel time before you leave. A crash, repair or fog can change which option is better on a given day. If your destination lies far from an interchange, however, the extra local drive may cancel the time you save on the main road.
After you reach Vadodara or Ahmedabad
Plan the last few kilometres before you leave the expressway. City roads near both ends can slow down at office hours, and parking may be limited. So save your destination in a map app while stopped, not while driving. If you carry on to another highway, check the connecting signs early, because late lane changes near an interchange are risky.
Frequently asked questions about the Ahmedabad Vadodara Expressway
What is National Expressway 1?
NE1 is the Ahmedabad Vadodara Expressway in Gujarat, also called the Mahatma Gandhi Expressway.
How long is the Ahmedabad Vadodara Expressway?
It is 93.1 km long.
When did the expressway open?
It opened on 16 August 2004.
What is the car toll from Ahmedabad to Vadodara?
A published table shows ₹135, while other guides quote ₹125 to about ₹140. Check the plaza board for the current charge.
Which are the intermediate exits?
There are exit loops for Nadiad/Kheda and Anand.
Are two-wheelers allowed on NE1?
No. Two-wheelers are not permitted.
How long does the drive take?
The road itself is about an hour in normal conditions. City traffic can add to your total time.
Make the most of NE1
The Ahmedabad Vadodara Expressway is simple to use if you decide your exit first. Keep your FASTag funded, expect the toll to differ from old tables and follow posted speed signs. When visibility drops, slow down and give yourself more time.
Sources
- National Highways Authority of India, maintaining agency
- Wikipedia: Ahmedabad–Vadodara Expressway (history, exits and toll table)
- Express Belong and Payal Cab guides (other published toll and speed figures)
Information only. The Hind Times is not affiliated with any government or organisation. See our disclaimer.
Related guides
Project status
- Partly open929 of 1,445 km open
- Open594 of 594 km open
- Open135.6 of 135.6 km open
- Open29 of 29 km open